Pöyry Awarded Pulp Mill Engineering Contract in Brazil


Vantaa, Finland, 13 January 2011 -- Pöyry's Industry Business Group has been awarded a basic and detailed engineering contract by Eldorado Celulose e Papel Ltda for the balance of plant of the 1.5 million tons/year bleached eucalyptus market pulp mill to be built in Mato Grosso do Sul state, Brazil. The assignment also includes the suppliers' document management. The value of Pöyry's contract is about EUR 8.4 million. The duration of Pöyry's engineering services will be about 14 months.

The contract is a continuation of the pre-engineering and preparatory work for the mill infrastructure that Pöyry was awarded in early 2010.

The concept of the mill is based on the use of the best available technologies and the best environmental practices, which constitute the state-of-the-art level. The technical-environmental criteria established for this project are based on international norms and standards and, mainly, on the Brazilian experience, which will make it possible for the mill to produce more with less use of natural resources, low production costs, progressive environmental impact reduction, and minimum work accident risks.

Pöyry is a global consulting and engineering company dedicated to balanced sustainability and responsible business. With quality and integrity at its core, the company delivers best-in-class management consulting, total solutions, and design and supervision. Pöyry's in-depth expertise extends to the fields of energy, industry, urban and mobility, and water and environment. Pöyry has 7000 experts and the local office network in about 50 countries. Pöyry's net sales in 2009 were EUR 674 million and the company's shares are quoted on NASDAQ OMX Helsinki. (Pöyry PLC: POY1V).